UTT - Mapei

UTT Mapei

Search by project
Search by related products
Or select a category

Al-Haer Wastewater Conveyor

Riyad, Al-Riyad, Arabia Saudita

2016
CLIENT
National Water Company

CONTRACTOR

Pizzarotti (PRIDE Ltd)

DESCRIPTION
The project consists in the excavation with a TBM Double Shield Lovat (diameter 3,7m) of two hydraulic tunnels of approximately 12 km.
The tunnels are located in Riyadh South, and are part of a main sewer of 33.4 km which collects all of municipal wastewater in the city of Riyadh and conveys them to the new treatment plant built in the Al-Haer
  • LAMPOSILEX

    LAMPOSILEX

    Ultra quick-setting and hardening hydraulic binder for blocking seeping water.
    MORE INFO
  • MAPEBENT CBS 2

    MAPEBENT CBS 2

    MORE INFO
  • MAPECURE SRA

    MAPECURE SRA

    Curing admixture for cementitious mortar and concrete to reduce hydraulic shrink
    MORE INFO
  • MAPEGROUT T60

    MAPEGROUT T60

    Fibre-reinforced, sulphate-resistant thixotropic mortar for repairing concrete.
    MORE INFO
  • MAPEQUICK CBS SYSTEM 1

    MAPEQUICK CBS SYSTEM 1

    Liquid retarding admixture with plasticizing effect for cementitious-based injec
    MORE INFO
  • MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2
    MORE INFO
  • RESFOAM 1KM

    RESFOAM 1KM

    One-component, ultra-fluid polyurethane resin applied by injection for waterproo
    MORE INFO
  • STABILCEM T

    STABILCEM T

    One-component pre-blended thixotropic mortar with controlled shrinkage for ancho
    MORE INFO
24.6011020000,46.6623320000
 
This website uses cookies to improve your browsing experience. To find out more, including how to manage the cookies, read our Cookie Policy. By continuing to browse this website, you agree to our use of cookies.