UTT - Mapei

UTT Mapei

Search by project
Search by related products
Or select a category

Al-Haer Wastewater Conveyor

Riyad, Al-Riyad, Arabia Saudita

2016
CLIENT
National Water Company

CONTRACTOR

Pizzarotti (PRIDE Ltd)

DESCRIPTION
The project consists in the excavation with a TBM Double Shield Lovat (diameter 3,7m) of two hydraulic tunnels of approximately 12 km.
The tunnels are located in Riyadh South, and are part of a main sewer of 33.4 km which collects all of municipal wastewater in the city of Riyadh and conveys them to the new treatment plant built in the Al-Haer
  • LAMPOSILEX

    LAMPOSILEX

    Ultra quick-setting and hardening hydraulic binder for blocking seeping water.
    MORE INFO
  • MAPEBENT CBS 2

    MAPEBENT CBS 2

    MORE INFO
  • MAPECURE SRA

    MAPECURE SRA

    Curing admixture for cementitious mortar and concrete to reduce hydraulic shrink
    MORE INFO
  • MAPEGROUT T60

    MAPEGROUT T60

    Fibre-reinforced, sulphate-resistant thixotropic mortar for repairing concrete.
    MORE INFO
  • MAPEQUICK CBS SYSTEM 1

    MAPEQUICK CBS SYSTEM 1

    Liquid retarding admixture with plasticizing effect for cementitious-based injec
    MORE INFO
  • MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2
    MORE INFO
  • RESFOAM 1KM

    RESFOAM 1KM

    One-component, ultra-fluid polyurethane resin applied by injection for waterproo
    MORE INFO
  • STABILCEM T

    STABILCEM T

    One-component pre-blended thixotropic mortar with controlled shrinkage for ancho
    MORE INFO
24.6011020000,46.6623320000
 
In order to give you a better service the Mapei S.p.A. website uses cookies. Continuing to browse the site you are agreeing to our use of cookies.