UTT - Mapei

UTT Mapei

Search by project
Search by related products
Or select a category

Cable Tunnel C-302

Singapore

2004 - 2008
CLIENT
SP Powergrid

CONTRACTOR

Downer Engineering

DESCRIPTION
The Tunnel of 2.65 km long was excavated with a TBM, manufactured by LOVAT, of a 6.15 m diameter.
The entire tunnel alignment was constructed beneath the ground water table.The alignment from northwest to southeast supported a maximum ground water pressure above invert up to 3.7 bar.
  • POLYFOAMER FP

    POLYFOAMER FP

    High performance liquid foaming agent, based on
    biodegradable anionic surfact
    MORE INFO
  • STABILFOAM 300

    STABILFOAM 300

    High performance liquid foaming agent for soil conditioning

    Where to use
    MORE INFO
1.2828840000,103.7789610000
 
In order to give you a better service the Mapei S.p.A. website uses cookies. Continuing to browse the site you are agreeing to our use of cookies.