UTT - Mapei

UTT Mapei

Search by project
Search by related products
Or select a category

Downtown Line Stage 2 - C919

Singapore

2010 - 2011
CLIENT
LTA

CONTRACTOR

Sembawang Engineers and Constructors (SG)

DESCRIPTION
TBM type: 1x EPBM (Herrenknecht)diameter:6.5m tunnel length:2x 980 m
Contract 919 is for the design and construction of stations and tunnels at Botanic Gardens and Stevens.
UTT Mapei supplied products as slurries for TBM, admixtures for backfill grouting and conditioning agents together with the product for fina lcoating MAPECOAT W SP, supplied for almost all Singapore metro.
  • MAPEBENT CBS 2

    MAPEBENT CBS 2

    MORE INFO
  • MAPEBLOX T

    MAPEBLOX T

    MAPEBLOX T
    MORE INFO
  • MAPEDRILL F1

    MAPEDRILL F1

    Synthetic polymer in liquid form for water based fluids to be employedin mechani
    MORE INFO
  • MAPEQUICK CBS SYSTEM 1

    MAPEQUICK CBS SYSTEM 1

    Liquid retarding admixture with plasticizing effect for cementitious-based injec
    MORE INFO
  • MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2
    MORE INFO
  • POLYFOAMER FP

    POLYFOAMER FP

    High performance liquid foaming agent, based on
    biodegradable anionic surfact
    MORE INFO
1.3221530000,103.8139790000
 
This website uses cookies to improve your browsing experience. To find out more, including how to manage the cookies, read our Cookie Policy. By continuing to browse this website, you agree to our use of cookies.