Downtown Line Stage 3 - Contract 929a

Tai Seng Avenue Singapore

2011 - 2013
CLIENT
LTA

CONTRACTOR

J.V. Nishimatsu ( Japan)

DESCRIPTION
3 EPBM (Herrenknecht) with a diameter of 6.5m excavated one 5950m long tunnel
Contract C929A is for the construction of tunnels between Ubi and Kaki Bukit, between Tai Seng Facility Building and Bedok Town Park.
In order to protect the concrete segment lining, the product MAPECOAT W SP was used in order to guarantee the protection from the abrasion caused by the passage of the TBM tail brushes.
  • MAPEBENT CBS 2

    MAPEBENT CBS 2

    MORE INFO
  • MAPEBLOX PKG

    MAPEBLOX PKG

    Packing grease for mechanized
    tunnelling with TBM
    MORE INFO
  • MAPEBLOX T

    MAPEBLOX T

    MAPEBLOX T
    MORE INFO
  • MAPEBLOX/T L

    MAPEBLOX/T L

    Tail seal grease for mechanized tunneling with TBM
    MORE INFO
  • MAPEDRILL F1

    MAPEDRILL F1

    Synthetic polymer in liquid form for water based fluids to be employedin mechani
    MORE INFO
  • MAPEOIL HFR 46

    MAPEOIL HFR 46

    High performance hydraulic oil for TBM

    Where to use
    Mapeoil HFR 46 is
    MORE INFO
  • MAPEQUICK CBS SYSTEM 1

    MAPEQUICK CBS SYSTEM 1

    Liquid retarding admixture with plasticizing effect for cementitious-based injec
    MORE INFO
  • MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2
    MORE INFO
  • POLYFOAMER FLS

    POLYFOAMER FLS

    Liquid foaming agent, combined with an anti-clay polymer, based on biodegradable
    MORE INFO
  • POLYFOAMER FP

    POLYFOAMER FP

    High performance liquid foaming agent, based on
    biodegradable anionic surfact
    MORE INFO
1.3376999000,103.8906590000
 
This website uses cookies to improve your browsing experience. To find out more, including how to manage the cookies, read our Cookie Policy. By continuing to browse this website, you agree to our use of cookies.