Brescia-Verona High Speed railway, Lonato tunnel

Location icon Brescia, Italy
The Lonato tunnel is the most complex project along the Brescia-Verona High Speed Railway line. Built by Seli Overseas with one 10,5 metres diameter EPB TBM by CREG, with more than 9 km total in length. Resfoam 1K-M was used to solve structural yeldings that occurred during the excavation process. The team has recently completed the excavation of the first barrel.
Ref #: 31
Category: INFRASTRUCTURES

Construction

Location Brescia, Italy
Subcategory
Application Type

Product used for the project

MAPEBENT CBS4
MAPEBENT CBS4
Sodic bentonite for civil engineering
MAPEDRILL SV
MAPEDRILL SV
Natural polymer in powder for mechanized tunnelling with TBM and drilling…
MAPEQUICK CBS SYSTEM 3
MAPEQUICK CBS SYSTEM 3
Accelerator for cement-based grouts
POLYFOAMER ECO 100 PLUS
POLYFOAMER ECO 100 PLUS
High-performance glycol-free foaming agent with a natural polymer quickly…
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…
2384 - DEFOAMER XP/BIO1
DEFOAMER XP/BIO1
Product not available for this market,
contact us
2343 - MAPEQUICK CBS SYSTEM 1 L
MAPEQUICK CBS SYSTEM 1 L
Product not available for this market,
contact us