Roadway tunnel in Krolsky

Location icon Krasnojarsk, Region Krasnojarsk, Russia, Russia
Construction of the new Krolsky tunnel on the Abakan – Taishet section of the Krasnoyarsk railway. Length of the tunnel – 2253.6 m.
Scope of work: construction of a new tunnel parallel to the existing one on the high side at a distance of 36 m. Tunnel excavation is performed by means of a LOVAT RME-375 SE, D=9.5 m mechanized shield complex with an earth pressure system.The new Krolsky Tunnel became the first railroad tunnel in Russia to be excavated by means of a mechanized tunnel-boring complex.
Ref #: 0
Category:

Construction

Location Krasnojarsk, Region Krasnojarsk, Russia, Russia
Subcategory
Built in 2005
Opened in 2007
Application Type
Client JSC 'Russian Railways' ( 'DSOZHT', the city of Khabarovsk)
Contractor company Bamtonnelstroy
Other mechanized tunnelling: underground TBM works

Product used for the project

MAPEBLOX PKG
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T