UTT - Mapei

UTT Mapei

Search by project
Search by related products
Or select a category

Circle Line Stage I - Contract 828

Nicholl Highway Singapore

2006 - 2007
CLIENT
LTA

CONTRACTOR

J.V. Nishimatsu ( Japan) and Lum Chang (SG)

DESCRIPTION
Contract 828 of Circle Line Stage I covered the architectural works of the Stadium and Nicholl Highway Stations.
technical info:TBM type: EPB Hitachi diameter: 6.35 m; tunnel length: 2x1200m
The construction of the mass Rapid Transit rail system of the Singapore island have been excavated by two Herrenknecht EPBM's, that went through soft marine clays, fluvial sands, as well as strong to very strong rocks. 1200 m length twin bore and 6.61 m diameter cut.
For the concrete segment protection the product MAPECOAT W SP was selected, proving to be resistant to the abrasion caused by the brushes of scrubbing machines as well as unaffected by the passage of the TBM tail brushes.
  • MAPEBLOX T

    MAPEBLOX T

    MAPEBLOX T
    MORE INFO
  • MAPEOIL HFR 46

    MAPEOIL HFR 46

    High performance hydraulic oil for TBM

    Where to use
    Mapeoil HFR 46 is
    MORE INFO
1.3002040000,103.8630090000
 
This website uses cookies to improve your browsing experience. To find out more, including how to manage the cookies, read our Cookie Policy. By continuing to browse this website, you agree to our use of cookies.