UTT - Mapei

UTT Mapei

Search by project
Search by related products
Or select a category

Metro Line n.5 in Bucharest - Romania

Bucharest, Romania

CLIENT
Metrorex

CONTRACTOR

Astaldi (Italy) - Fomento de Construcciones y Contratas (Spain) - AB Construct (Romania)

DESCRIPTION
Two TBM - EPB manufactured by Herrenknecht are currently excavating the Metro Line 5 that constitutes phase IV of the Bucharest metro modernization project.
The Section 2 of the line n.5 will be 8.7 km-long.
Two parallel tunnels each of 5.7 m-diameter and 4.85 km-long are under construction.
  • EPOJET LV

    EPOJET LV

    Two-component epoxy resin with a very low viscosity for injecting into micro-cra
    MORE INFO
  • MAPEBENT CBS 2

    MAPEBENT CBS 2

    MORE INFO
  • MAPEBENT CBS4

    MAPEBENT CBS4

    Sodic bentonite for civil engineering
    MORE INFO
  • MAPEJET SYSTEM C40

    MAPEJET SYSTEM C40

    Two-component cement-free binder for low and very low permeable ground consolida
    MORE INFO
  • MAPEQUICK CBS SYSTEM 1

    MAPEQUICK CBS SYSTEM 1

    Liquid retarding admixture with plasticizing effect for cementitious-based injec
    MORE INFO
  • MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2

    MAPEQUICK CBS SYSTEM 2
    MORE INFO
  • POLYFOAMER FP/CC

    POLYFOAMER FP/CC

    High performance liquid foaming agent, based on
    biodegradable anionic surfact
    MORE INFO
  • POLYFOAMER FP-L

    POLYFOAMER FP-L

    MORE INFO
  • RESFOAM 1KM

    RESFOAM 1KM

    One-component, ultra-fluid polyurethane resin applied by injection for waterproo
    MORE INFO
44.4325000000,26.1038889000
 
This website uses cookies to improve your browsing experience. To find out more, including how to manage the cookies, read our Cookie Policy. By continuing to browse this website, you agree to our use of cookies.