UTT - Mapei

UTT Mapei

Search by project
Search by related products
Or select a category

Theun-Hinboun Hydropower Plant

Bolikhamxai, Laos

2008 - 2011
CLIENT
Cavico Bridge and Tunnel Joint Stock Company - Vietnam

CONTRACTOR

Cavico Bridge and Tunnel Joint Stock Company - Vietnam

DESCRIPTION
To optimize the potential of the Nam Theun basin to deliver energy during the dry season, when many other Lao power plants run at reduced capacity.
the expansion project brought the total combined generating capacity of THPC to 510 MW, with much of the water from the new reservoir being used to generate power twice.
headrace tunnel length: 300 m and diameter:11m method: New Austria Tunneling Method (NATM)
  • EXPANFLUID

    EXPANFLUID

    Expansive anti-shrinkage agent for slurries for injection.
    TECHNICAL DATA:
    MORE INFO
  • MAPEQUICK AFK 888

    MAPEQUICK AFK 888

    Alkali-free accelerator for shotcrete

    Where to use
    • Securing surfaces
    MORE INFO
18.4362924000,104.4723301000
 
This website uses cookies to improve your browsing experience. To find out more, including how to manage the cookies, read our Cookie Policy. By continuing to browse this website, you agree to our use of cookies.