The project involves the construction of a main water collection tunnel 9.5 km long and with an excavation diameter of 4.5 metres, as well as the construction of 21 access shafts of various diameters and with depths ranging from 15 to 30 metres. EXcatation completed, carried out by 2 x EPB TBM Herrenknecht.
Synthetic waterproofing membrane Where to use • Drill and blast tunnel waterproofing. • Open cut tunnel waterproofing. • Underground structures waterproofing. Packaging Mapeplan TU S is supplied in…
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…
High performance liquid foaming agent, based on biodegradable anionic surfactants, in combination with a natural lubricating polymer, for ground conditioning in mechanized tunnelling
High performance liquid foaming agent, based on biodegradable anionic…
Liquid foaming agent, based on biodegradable anionic surfactants, in combination with a lubricating polymer, for ground conditioning in mechanized tunnelling
Liquid foaming agent, based on biodegradable anionic surfactants, in…
One-component, ultra-fluid polyurethane resin applied by injection for waterproofing structures and ground and rocks subject to intense percolating water. The reaction time may be regulated.
One-component, ultra-fluid polyurethane resin applied by injection for…