Toggle navigation
About & Services
Products
Projects
Downloads
News
Contact us
Back
AEM TORINO – PONT VENTOUX
Oulx, TO, Italia, Italy
HYDROELECTRICAL TUNNEL: 18 KM LENGHT
Ref #:
0
Category:
Construction
Location
Oulx, TO, Italia, Italy
Subcategory
Built in
1995
Opened in
2006
Application Type
Client
ASTALDI
Contractor company
Astaldi
Browse the
project Gallery
Product used
for the project
DYNAMON SR3
Super-plasticizers based on a modified acrylic polymer for ready-mix concrete with low water/cement ratio, extremely high mechanical strength and long slump retention
Super-plasticizers based on a modified acrylic polymer for ready-mix concrete…
MAPELASTIC TU SYSTEM
One-component ready to use polymeric sprayable membrane for tunnels and underground structure waterproofing
One-component ready to use polymeric sprayable membrane for tunnels and…
MAPEQUICK AF 1000
Alkali-free accelerator for shotcrete
Alkali-free accelerator for shotcrete
MAPEQUICK AF 2000
Alkali-free accelerator for shotcrete
Alkali-free accelerator for shotcrete
MAPELASTIC
Product not available for this market,
contact us
Product not available for this market,
contact us
SILICAJET EXP
Product not available for this market,
contact us
Product not available for this market,
contact us