The project consists in the excavation with a TBM Double Shield Lovat (diameter 3,7m) of two hydraulic tunnels of approximately 12 km. The tunnels are located in Riyadh South, and are part of a main sewer of 33.4 km which collects all of municipal wastewater in the city of Riyadh and conveys them to the new treatment plant built in the Al-Haer