Toggle navigation
About & Services
Products
Projects
Downloads
News
Contact us
Back
Alpine/Mac Connel Dowell Down Town Line 2 Contract 917
Singapore, Singapore
Excavation with 2 EPB of 6.61 meters fiameter from Herrencknecht at Singapore Down Town Line 2.
Tunnel length: 2x1200m
Ref #:
0
Category:
Construction
Location
Singapore, Singapore
Subcategory
Built in
2011
Opened in
2014
Application Type
Client
LTA
Contractor company
Alpine Bau GmbH and Mac Connel Dowell
Product used
for the project
MAPEBENT CBS2
Bentonite for use in all engineering application
Bentonite for use in all engineering application
MAPEBLOX T
Tail sealant for mechanized tunneling with TBM
Tail sealant for mechanized tunneling with TBM
MAPEBLOX PKG
Product not available for this market,
contact us
Product not available for this market,
contact us
MAPEDRILL F1
Product not available for this market,
contact us
Product not available for this market,
contact us
MAPEQUICK CBS SYSTEM 1
Product not available for this market,
contact us
Product not available for this market,
contact us
MAPEQUICK CBS SYSTEM 2
Product not available for this market,
contact us
Product not available for this market,
contact us