Alpine/Mac Connel Dowell Down Town Line 2 Contract 917

Location icon Singapore, Singapore
Excavation with 2 EPB of 6.61 meters fiameter from Herrencknecht at Singapore Down Town Line 2.
Tunnel length: 2x1200m
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2011
Opened in 2014
Application Type
Client LTA
Contractor company Alpine Bau GmbH and Mac Connel Dowell

Product used for the project

MAPEBENT CBS2
MAPEBENT CBS2
Bentonite for use in all engineering application
MAPEBLOX PKG
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
MAPEDRILL F1
MAPEDRILL F1
Synthetic polymer in liquid form for water based fluids to be employedin…
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Liquid activator admixture used in extremely fluid backfill grouts systems,…