Aluoi Hydroelectric Power Plant

Location icon Hue, Hanoi, Vietnam, Vietnam
LUOI HYDROELECTRIC POWER PLANT is the longest and the most sophisticated in Vietnam.
excavation method: New Austria Tunneling Method (NATM).
headrace tunnel length: 12km average diameter of 6.2m
Ref #: 0
Category:

Construction

Location Hue, Hanoi, Vietnam, Vietnam
Subcategory
Built in 2007
Opened in 2010
Application Type
Client Cavico Bridge & Tunnel Constructon/Joint Stock Company/ Lung Lo Construction Company/ Song Da 505 Joint Stock Company
Contractor company Cavico Bridge & Tunnel Constructon Joint Stock Company/Lung Lo Construction Company/Song Da 505 Joint Stock Company

Product used for the project

DYNAMON EASY 11
DYNAMON EASY 11
Modified acrylic-based super-plasticizer for ready-mixed concrete Where to use…
EXPANFLUID
EXPANFLUID
Expansive anti-shrinkage agent for slurries for injection.
MAPEPLAST UTT
MAPEPLAST UTT
Admixture for enhancing the pumpability of sprayed concrete Where to use…
MAPEQUICK AFK 888
MAPEQUICK AFK 888
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…