Ankhe-Kanak Hydropower Plant

Location icon Gia Lai, Provincia di Gia Lai, Vietnam, Vietnam
hydroelectric power plant
excavation method: New Austria Tunneling Method (NATM)
tunnel lenght: 1800m length diameter: 5.5m
Ref #: 0
Category:

Construction

Product used for the project

DYNAMON EASY 11
DYNAMON EASY 11
Modified acrylic-based super-plasticizer for ready-mixed concrete Where to use…
EXPANFLUID
EXPANFLUID
Expansive anti-shrinkage agent for slurries for injection.
MAPEQUICK AFK 888
MAPEQUICK AFK 888
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…