Location | Germany |
---|---|
Subcategory | |
Application | 1 tubes road tunnel with two lanes, one lane in each direction by length with 440 m, and an escape and rescue tunnel with 133 m. Both tunnels was excavated by drill and blast method with shotcrete application. |
Start and finish date | 2018/2019 |
Application Type | |
Client | Bundesrepublik Deutschland; Autobahndirektion Südbayern |
Contractor company | Marti GmbH Deutschland |