Bühltunnel Siegen

Location icon Siegen, Germania, Germany
1 tube road tunnel for the B 54 / B 62 with a length by 420 m drill and blast excavation method with shotcrete application
Ref #: 0
Category:

Construction

Location Siegen, Germania, Germany
Subcategory
Built in 2012
Opened in 2013
Application Type
Client Landesbetrieb Straßenbau NRW
Contractor company Ed. Züblin AG

Product used for the project

MAPEQUICK AF 1000
MAPEQUICK AF 1000
Alkali-free accelerator for shotcrete