Ba Ha Hydroelectric Power Plant

Location icon Phú Yên, Provincia di Phu Yen, Vietnam, Vietnam
Once fully operational, the tunnel provided a total of 825 million kWh per year.
headrace tunnel 's length:2800m and diameter: 5.5m
Ref #: 0
Category:

Construction

Product used for the project

DYNAMON EASY 11
DYNAMON EASY 11
Modified acrylic-based super-plasticizer for ready-mixed concrete Where to use…
EXPANFLUID
EXPANFLUID
Expansive anti-shrinkage agent for slurries for injection.
MAPEQUICK AFK 888
MAPEQUICK AFK 888
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…