Ba Ha Hydroelectric Power Plant

Location icon Phú Yên, Provincia di Phu Yen, Vietnam, Vietnam
Once fully operational, the tunnel provided a total of 825 million kWh per year.
headrace tunnel 's length:2800m and diameter: 5.5m
Ref #: 0
Category:

Construction

Location Phú Yên, Provincia di Phu Yen, Vietnam, Vietnam
Subcategory
Built in 2004
Opened in 2006
Application Type
Client Song Da Enterprise 10.2
Contractor company Song Da Enterprise 10.2

Product used for the project

DYNAMON EASY 11
DYNAMON EASY 11
Modified acrylic-based super-plasticizer for ready-mixed concrete Where to use…
EXPANFLUID
EXPANFLUID
Expansive anti-shrinkage agent for slurries for injection.
MAPEQUICK AFK 888
MAPEQUICK AFK 888
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…