| Yard | Rescue tunnel with a length of 270 meters for the existing 550 meter road tunnel "Burgbergtunnel" in Bernkastel-Kues. Drill and blast excavation method with shotcrete application. |
|---|---|
| Location | Germany |
| Subcategory | |
| Application | Rescue tunnel with a length of 270 meters for the existing 550 meter road tunnel "Burgbergtunnel" in Bernkastel-Kues. Drill and blast excavation method with shotcrete application. |
| Start and finish date | 2018/2019 |
| Application Type | |
| Client | Landesbetrieb Mobilität Rheinland-Pfalz |
| Contractor company | BeMo Tunnelling GmbH |