Cable Tunnel C-302

Location icon Singapore, Singapore
The Tunnel of 2.65 km long was excavated with a TBM, manufactured by LOVAT, of a 6.15 m diameter.
The entire tunnel alignment was constructed beneath the ground water table.The alignment from northwest to southeast supported a maximum ground water pressure above invert up to 3.7 bar.
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2004
Opened in 2008
Application Type
Client SP Powergrid
Contractor company Downer Engineering

Product used for the project

POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
STABILFOAM 300
STABILFOAM 300
High performance liquid foaming agent for soil conditioning Where to use…