Singapore Power Transmission Cable Tunnel Project aims to develop a long-term solution for Singapore’s future power supply through the construction of two cable tunnels that will allow for efficiently installation and replacement of underground cables to meet the increasing demand for power supply. The two tunnels, which run from North-South and East-West respectively, are built 60 metres underground and will reach Singapore’s deepest tunnel depth. The EW2 sits on the Cable Tunnel East-West line.
High performance hydraulic oil for TBM Where to use Mapeoil HFR 68 is suitable for all types of hydraulic equipment for industrial applications, such as machines for mechanized tunnelling (TBM).…
High performance hydraulic oil for TBM Where to use Mapeoil HFR 68 is suitable…