It is one of the three contracts of the proposed 16.5km long East-West Transmission Cable Tunnel. Structures in this contract consist of an equipment building and a cable entry shaft at Kallang (near Geylang Bahru Lane); a temporary shaft at Airport Road and a ventillation shaft at Paya Lebar Substation including connecting tunnels/ adits/ enlargements.
Synthetic waterproofing membrane Where to use • Drill and blast tunnel waterproofing. • Open cut tunnel waterproofing. • Underground structures waterproofing. Packaging Mapeplan TU S is supplied in…
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…