Cable Tunnel EW3

Location icon Singapore, Singapore
It is one of the three contracts of the proposed 16.5km long East-West Transmission Cable Tunnel. Structures in this contract consist of an equipment building and a cable entry shaft at Kallang (near Geylang Bahru Lane); a temporary shaft at Airport Road and a ventillation shaft at Paya Lebar Substation including connecting tunnels/ adits/ enlargements.
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2013
Opened in 2014
Application Type
Client SP Powergrid
Contractor company Nishimatsu