Cable Tunnel EW3

Location icon Singapore, Singapore
It is one of the three contracts of the proposed 16.5km long East-West Transmission Cable Tunnel. Structures in this contract consist of an equipment building and a cable entry shaft at Kallang (near Geylang Bahru Lane); a temporary shaft at Airport Road and a ventillation shaft at Paya Lebar Substation including connecting tunnels/ adits/ enlargements.
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2013
Opened in 2014
Application Type
Client SP Powergrid
Contractor company Nishimatsu

Product used for the project

MAPEDRILL FFT
MAPEDRILL FFT
Natural powder clay ideally suited to soil stabilisation in front of tunnel…
MAPEDRILL FFT
MAPEDRILL FFT
Natural powder clay ideally suited to soil stabilisation in front of tunnel…
MAPEPLAN TU S
MAPEPLAN TU S
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…