The Contract NS2 forms the central contract of the North-South Transmission Cable Tunnel running from Mandai Shaft to Ang Mo Kio Shaft. The works in this Contract comprise the construction of a 5.35km tunnel with an internal diameter of 6m. Three circular shafts will be provided as part of the works, Mandai Shaft, Tagore Shaft and Ang Mo Kio Shaft.
Final coating: MAPECOAT W SP, world product leader of the Sector, was chosen for the project.
Backfill grouting: MAPEBENT API
Construction
|
|
| Location |
Singapore, Singapore
|
| Subcategory |
|
| Built in |
2014
|
| Opened in |
2016
|
| Application Type |
|
| Client |
SP Powergrid
|
| Contractor company |
SK E&C
|