Contract 823 involved the construction and completion of stations at Mountbatten, Dakota and Paya Lebar including tunnels technical info:TBM type: EPB Hitachi diameter: 6.35 m tunnel length: 2x1200 Together with the products for ground conditioning & oils and greases for the TBM, the product MAPECOAT W SP was supplied for the protection of the concrete lining.
High performance hydraulic oil for TBM Where to use Mapeoil HFR 46 is suitable for all types of hydraulic equipment for industrial applications, such as machines for mechanized tunnelling (TBM).…
High performance hydraulic oil for TBM Where to use Mapeoil HFR 46 is suitable…