Circle Line Stage II - Contract 822

Location icon MacPherson Road Singapore, Singapore
The Circle Line (CCL) is a significant part of Singapore’s growing rail system which was built in various stages to provide greater connectivity for commuters, optimizing travelling time by bypassing the city.Contract 822 of Circle Line Stage II covered the construction of the MacPherson and Upper Paya Lebar underground stations and tunnels
technical info: TBM type: 1x EPBM (Mitsubishi) tunnel length:2x 2100 m
As for other projects of the Circle Line, MAPECOAT W SP is the product used for the final coating
Ref #: 0
Category:

Construction

Location MacPherson Road Singapore, Singapore
Subcategory
Built in 2003
Opened in 2005
Application Type
Client LTA
Contractor company Econ Pte Ltd (SG) & NCC (SE) JV

Product used for the project

MAPEGROUT THIXOTROPIC ZERO
MAPEGROUT THIXOTROPIC ZERO
MAPEGROUT THIXOTROPIC ZERO is used for repairing horizontal and vertical…
This product replaces MAPEGROUT THIXOTROPIC
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
STABILFOAM 300
STABILFOAM 300
High performance liquid foaming agent for soil conditioning Where to use…