Circle Line Stage II - Contract 853

Location icon Marymount Stn Singapore, Singapore
Contract C853 is for the construction of Marymount station and associated tunnels between Lorong Chuan and Bishan stations and Bishan and Marymount stations
TBM type: 1x EPBM (Herrenknecht); tunnel length:2x 3000 m
For the concrete segment protection Mapei UTT supplied the prodcut MAPECOAT W SP, especially designed to resist to the abrasion caused by the brushes of scrubbing machines and to the passage of the TBM tail brushes that do not cause any damage to it.
Ref #: 0
Category:

Construction

Location Marymount Stn Singapore, Singapore
Subcategory
Built in 2005
Opened in 2007
Application Type
Client LTA
Contractor company Taisei Corporation (Japan)

Product used for the project

POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…