Circle Line Stage III Project – Contract 937

Location icon River Valley Road Singapore, Singapore
Contract 937 of Circle Line Stage III covered the construction of River Valley station and associated tunnels.
Technical info: 2 EPB and 2 Slurry Herrenknecht EPB; 1 EPB Robbins; diameter:6.35m; tunnel length: 2x 1650m.
The product MAPECOAT W SP was chosen for the concrete segment protection, since it proved to be resistant to the passage of the TBM tail brushes.
Ref #: 0
Category:

Construction

Location River Valley Road Singapore, Singapore
Subcategory
Built in 2005
Opened in 2009
Application Type
Client LTA
Contractor company Dongah Engineering