Contract 852 covered the construction of Serangoon interchange station and associated tunnels between Bartley and Serangoon stations and between Serangoon and Lorong Chuan stations. technical info: TBM type: 1x EPBM (Herrenknecht) diameter: 6.35m tunnel length:2x 1650 m For the concrete segment protection, MAPECOAT W SP was supplied
Synthetic polymer in liquid form for water based fluids to be employedin mechanized tunnelling and drilling Where to use Mapedrill F1 has a stabilizing effect on mixed round and/or very altered…
Synthetic polymer in liquid form for water based fluids to be employedin…
High performance liquid foaming agent, based on biodegradable anionic surfactants, in combination with a natural lubricating polymer, for ground conditioning in mechanized tunneling
High performance liquid foaming agent, based on biodegradable anionic…
High performance liquid foaming agent for soil conditioning Where to use Stabilfoam 300 is specifically formulated for the preparation of stable TBM (EPB) foams. This product is suited for TBM…
High performance liquid foaming agent for soil conditioning Where to use…