Dübelschächte Hochmoselbrücke
Ürzig, Germania, Germany
Rock Consolidation: drill excavation method with shotcrete application.
Six shafts with a diameter of 6 and a depth of 40 meters.
Construction
|
|
| Location |
Ürzig, Germania, Germany
|
| Subcategory |
|
| Built in |
2016
|
| Opened in |
2017
|
| Application Type |
|
| Client |
Landesbetrieb Mobilität Rheinland-Pfalz
|
| Contractor company |
Wayss & Freytag
|