Quang Nam, Provincia di Quang Nam, Vietnam, Vietnam
With 4000m length and 6.5m diameter, the headrace tunnel was excavated by New Austria Tunneling Method (NATM). With total investment of VND4.547 billion (US$226 million), the project provides more than 780 million kWh of electricity per year.
Ref #: 0
Category:
Construction
Location
Quang Nam, Provincia di Quang Nam, Vietnam, Vietnam