Dakdrinh 2 Hydropower Plant

Location icon Kon Tum, Provincia di Kon Tum, Vietnam, Vietnam
With a length of 11km and 6.95m diameter excavated by New Austria Tunneling Method (NATM)
the headrace tunnel has a total capacity of 235MW and contributes 540 million KWh/year on average to the national electricity system.
Ref #: 0
Category:

Construction

Location Kon Tum, Provincia di Kon Tum, Vietnam, Vietnam
Subcategory
Built in 2007
Opened in 2014
Application Type
Client Songda Enterprise 10.2 Lung Lo 9 Construction Company
Contractor company Songda Enterprise 10.2 Lung Lo 9 Construction Company

Product used for the project

EXPANFLUID
EXPANFLUID
Expansive anti-shrinkage agent for slurries for injection.
MAPEQUICK AFK 888
MAPEQUICK AFK 888
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…