With a length of 11km and 6.95m diameter excavated by New Austria Tunneling Method (NATM) the headrace tunnel has a total capacity of 235MW and contributes 540 million KWh/year on average to the national electricity system.
Ref #: 0
Category:
Construction
Location
Kon Tum, Provincia di Kon Tum, Vietnam, Vietnam
Subcategory
Built in
2007
Opened in
2014
Application Type
Client
Songda Enterprise 10.2 Lung Lo 9 Construction Company
Contractor company
Songda Enterprise 10.2 Lung Lo 9 Construction Company