Toggle navigation
About & Services
Products
Projects
Downloads
News
Contact us
Back
Design and Construction of Jurong Island to Pioneer Transmission Cable Tunnel
Singapore, Singapore
TBM type:2 kawasaki slurries diameter: 6.35m tunnel length: 3880m
Ref #:
0
Category:
Construction
Location
Singapore, Singapore
Subcategory
Built in
2014
Opened in
2016
Application Type
Client
SW Powergrid
Contractor company
Penta-Ocean Construction (Japan)
Product used
for the project
MAPEBLOX T
Tail sealant for mechanized tunneling with TBM
Tail sealant for mechanized tunneling with TBM
MAPEBLOX PKG
Product not available for this market,
contact us
Product not available for this market,
contact us