Toggle navigation
About & Services
Products
Projects
Downloads
News
Contact us
Back
Design and Construction of Jurong Island to Pioneer Transmission Cable Tunnel
Singapore, Singapore
TBM type:2 kawasaki slurries diameter: 6.35m tunnel length: 3880m
Ref #:
0
Category:
Construction
Location
Singapore, Singapore
Subcategory
Built in
2014
Opened in
2016
Application Type
Client
SW Powergrid
Contractor company
Penta-Ocean Construction (Japan)
Product used
for the project
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T