Design and Construction of Jurong Island to Pioneer Transmission Cable Tunnel

Location icon Singapore, Singapore
TBM type:2 kawasaki slurries diameter: 6.35m tunnel length: 3880m
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2014
Opened in 2016
Application Type
Client SW Powergrid
Contractor company Penta-Ocean Construction (Japan)

Product used for the project

MAPEBLOX PKG
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T