Douro Litoral A41 Highway Picoto-Aguiar da Beira

Location icon Picoto, Portugal, Portugal
Drill and Blast tunnel excavation for the A41 Highway at Madeira, Portugal
Ref #: 0
Category:

Construction

Location Picoto, Portugal, Portugal
Subcategory
Built in 2009
Opened in 2011
Application Type
Client Estradas de Portugal
Contractor company DLOE (Zagope, Alves Ribeiro, Tamega, Teixeira)

Product used for the project

IDROSTOP
IDROSTOP
Hydrophilic, expanding rubber profiles for waterproof working joints.
MAPEPLAN TU
MAPEPLAN TU
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…