1 Hitachi EPB (diameter: 6.35m) was used for the construction and completion of tunnels between Promenade station and Marina Bay included in contract 905 of Circle Line Stage I. The contract is located within the heart of Singapore tourist and business district and uniquely; within the Formula1 Grand Prix race circuit. The product MAPECOAT W SP was used for the segment concrete protection, proving to be resistant to the abrasion of the TBM tail brushes.
High performance liquid foaming agent, based on biodegradable anionic surfactants, in combination with a natural lubricating polymer, for ground conditioning in mechanized tunneling
High performance liquid foaming agent, based on biodegradable anionic…