Downtown Line Stage 2 - C919

Location icon Singapore, Singapore
TBM type: 1x EPBM (Herrenknecht)diameter:6.5m tunnel length:2x 980 m
Contract 919 is for the design and construction of stations and tunnels at Botanic Gardens and Stevens.
UTT Mapei supplied products as slurries for TBM, admixtures for backfill grouting and conditioning agents together with the product for fina lcoating MAPECOAT W SP, supplied for almost all Singapore metro.
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2010
Opened in 2011
Application Type
Client LTA
Contractor company Sembawang Engineers and Constructors (SG)

Product used for the project

MAPEBENT CBS2
MAPEBENT CBS2
Bentonite for use in all engineering application
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
MAPEDRILL F1
MAPEDRILL F1
Synthetic polymer in liquid form for water based fluids to be employedin…
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Liquid activator admixture used in extremely fluid backfill grouts systems,…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…