Contract 913 od Downtown Line Stage 2 is for the Design and Construction of Hillview and Cashew stations and tunnels. 1 slurry (kawasaky) with a diameter of 6.35 m was used to excavate the twin-tunnels of 2x 1200 m.
Ref #: 0
Category:
Construction
Location
Hillview Avenue Singapore, Singapore
Subcategory
Built in
2011
Opened in
2012
Application Type
Client
LTA
Contractor company
GS Engineering (S. Korea), Subcon Dongah (S. Korea)