Downtown Line Stage 2 - Contract 913

Location icon Hillview Avenue Singapore, Singapore
Contract 913 od Downtown Line Stage 2 is for the Design and Construction of Hillview and Cashew stations and tunnels.
1 slurry (kawasaky) with a diameter of 6.35 m was used to excavate the twin-tunnels of 2x 1200 m.
Ref #: 0
Category:

Construction

Location Hillview Avenue Singapore, Singapore
Subcategory
Built in 2011
Opened in 2012
Application Type
Client LTA
Contractor company GS Engineering (S. Korea), Subcon Dongah (S. Korea)
Other mechanized tunnelling: underground TBM works

Product used for the project

MAPEBLOX PKG
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T