Downtown Line Stage 2 - Contract 915

Location icon Singapore, Singapore
TBM type: 1x slurry (hitachi) diameter: 6.35m tunnel lenght:2x 2800 m
Contract 915 for Downtown Line 2 (DTL2) civil works
For the segment concrete protection the product MAPECOAT W SP was used, proving to be resistant to the abrasion caused by the passage of the TBM tail brushes.
Ref #: 0
Category:

Construction