Downtown Line Stage 2 - Contract 915
Singapore, Singapore
TBM type: 1x slurry (hitachi) diameter: 6.35m tunnel lenght:2x 2800 m
Contract 915 for Downtown Line 2 (DTL2) civil works
For the segment concrete protection the product MAPECOAT W SP was used, proving to be resistant to the abrasion caused by the passage of the TBM tail brushes.
Construction
|
|
Location |
Singapore, Singapore
|
Subcategory |
|
Built in |
2011
|
Opened in |
2012
|
Application Type |
|
Client |
LTA
|
Contractor company |
SK Engineering (S. Korea) Subcon Dongah (S. Korea)
|