Downtown Line Stage 2 - Contract 916

Location icon Beauty World Singapore, Singapore
The contract 916 covered the design and construction of station at Beauty World and tunnels for the Downtown Line Stage 2.
technical info: TBM type: 1 slurry (Herrenknecht); tunnel length:2x 1500 m
For the segment concrete protection the product MAPECOAT W SP was used, proving to be resistant to the abrasion caused by the passage of the TBM tail brushes.
Ref #: 0
Category:

Construction

Location Beauty World Singapore, Singapore
Subcategory
Built in 2011
Opened in 2012
Application Type
Client LTA
Contractor company McConnell Dowell SE Asia (Australia)