Downtown Line Stage 2 - Contract 917

Location icon King Albert Park Singapore, Singapore
The S$320.7 million contract 917 is for the Design and Construction of Sixth Avenue and King Albert Park stations and tunnels.
Technical info: TBM type: 1x EPBM (Herrenknecht) with diameter 6.5m; tunnel length:2x 1200 m
MAPECOAT W SP, used for the concrete segment protection proved to be resistant to the abrasion caused by the passage of the TBm tail brushes and confirmed to be leader in its sector.
Ref #: 0
Category:

Construction

Location King Albert Park Singapore, Singapore
Subcategory
Built in 2011
Opened in 2014
Application Type
Client LTA
Contractor company Alpine GMBH; McConnell Dowell SE Asia (Australia)