Downtown Line Stage 2 - Contract 917

Location icon King Albert Park Singapore, Singapore
The S$320.7 million contract 917 is for the Design and Construction of Sixth Avenue and King Albert Park stations and tunnels.
Technical info: TBM type: 1x EPBM (Herrenknecht) with diameter 6.5m; tunnel length:2x 1200 m
MAPECOAT W SP, used for the concrete segment protection proved to be resistant to the abrasion caused by the passage of the TBm tail brushes and confirmed to be leader in its sector.
Ref #: 0
Category:

Construction

Product used for the project

MAPEBENT CBS2
MAPEBENT CBS2
Bentonite for use in all engineering application
MAPEBLOX T
MAPEBLOX T
Tail sealant for mechanized tunneling with TBM
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
2212 - DEFOAMER XP
DEFOAMER XP
Product not available for this market,
contact us
2226 - MAPEBLOX PKG
MAPEBLOX PKG
Product not available for this market,
contact us
2206 - MAPEDRILL F1
MAPEDRILL F1
Product not available for this market,
contact us
2339 - MAPEDRILL FFT
MAPEDRILL FFT
Product not available for this market,
contact us
2339 - MAPEDRILL FFT
MAPEDRILL FFT
Product not available for this market,
contact us
2274 - MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Product not available for this market,
contact us
2275 - MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Product not available for this market,
contact us