Downtown Line Stage 2 - Contract 920

Location icon Newton Stn Singapore, Singapore
Contract 920 is for the design and construction of Newton Station and tunnels.
1 EPBM hitachi with a diameter of 6,5m was used for a tunnel length of 2x 2500 m.
MAPECOAT W SP was the product selected for the protection of concrete segments, provin to be strongly resistant to abrasion.