Downtown Line Stage 2 - Contract 920

Location icon Newton Stn Singapore, Singapore
Contract 920 is for the design and construction of Newton Station and tunnels.
1 EPBM hitachi with a diameter of 6,5m was used for a tunnel length of 2x 2500 m.
MAPECOAT W SP was the product selected for the protection of concrete segments, provin to be strongly resistant to abrasion.
Ref #: 0
Category:

Construction

Location Newton Stn Singapore, Singapore
Subcategory
Built in 2011
Opened in 2012
Application Type
Client LTA
Contractor company STEC (China)

Product used for the project

MAPEBLOX PKG
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
MAPEDRILL F1
MAPEDRILL F1
Synthetic polymer in liquid form for water based fluids to be employedin…
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
2249 - MAPEDRILL BIO L
MAPEDRILL BIO L
Product not available for this market,
contact us