Downtown Line Stage 2 - Contract 920

Location icon Newton Stn Singapore, Singapore
Contract 920 is for the design and construction of Newton Station and tunnels.
1 EPBM hitachi with a diameter of 6,5m was used for a tunnel length of 2x 2500 m.
MAPECOAT W SP was the product selected for the protection of concrete segments, provin to be strongly resistant to abrasion.
Ref #: 0
Category:

Construction

Location Newton Stn Singapore, Singapore
Subcategory
Built in 2011
Opened in 2012
Application Type
Client LTA
Contractor company STEC (China)

Product used for the project

MAPEBLOX T
MAPEBLOX T
Tail sealant for mechanized tunneling with TBM
MAPEDRILL F1
MAPEDRILL F1
Synthetic polymer in liquid form for water based fluids to be employedin…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
2226 - MAPEBLOX PKG
MAPEBLOX PKG
Product not available for this market,
contact us
2249 - MAPEDRILL BIO L
MAPEDRILL BIO L
Product not available for this market,
contact us
2274 - MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Product not available for this market,
contact us