1 EPBM excavated the tunnel for a length of 800 m. Contract 921 for the design and construction of Rochor and Little India stations and associated tunnels. MAPECOAT W SP, used for the concrete segment protection proved to be resistant to the abrasion caused by the passage of the TBm tail brushes and confirmed to be leader in its sector.