Downtown Line Stage 3 - Contract 923a

Location icon Tampines East CC Singapore, Singapore
Contract 923A is for the construction of tunnels between Tampines East and Upper Changi Stations.
Technical data: 1 EPBM diameter:6.5m; tunnel lenght:2x 2400 m
Ref #: 0
Category:

Construction

Location Tampines East CC Singapore, Singapore
Subcategory
Built in 2011
Opened in 2011
Application Type
Client LTA
Contractor company STEC (China)
Other mechanized tunnelling: underground TBM works