Contracts 926 and 927 are for the construction of Tampines West and Bedok Reservoir stations and their associated tunnels. Excavation completed using 4 EPBM (stec) for a total tunnel lenght of 5400 m. MAPECOAT W SP, used for the concrete segment protection proved to be resistant to the abrasion caused by the passage of the TBm tail brushes and confirmed to be leader in its sector.