Downtown Line Stage 3 - Contract 926

Location icon Tampines Road Singapore, Singapore
Contracts 926 and 927 are for the construction of Tampines West and Bedok Reservoir stations and their associated tunnels.
Excavation completed using 4 EPBM (stec) for a total tunnel lenght of 5400 m.
MAPECOAT W SP, used for the concrete segment protection proved to be resistant to the abrasion caused by the passage of the TBm tail brushes and confirmed to be leader in its sector.
Ref #: 0
Category:

Construction

Location Tampines Road Singapore, Singapore
Subcategory
Built in 2011
Opened in 2011
Application Type
Client LTA
Contractor company CMC di Ravenna

Product used for the project

MAPEDRILL F1
MAPEDRILL F1
Synthetic polymer in liquid form for water based fluids to be employedin…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…