Downtown Line Stage 3 - Contract 927

Location icon Bedok Reservoir Road Singapore, Singapore
Contracts 926 and 927 are for the construction of Tampines West and Bedok Reservoir stations and their associated tunnels.
2 EPBM (Robbins) excavated the tunnels for a length 2x 2600 m.
In order to protect the concrete segment lining, the product MAPECOAT W SP was used in order to guarantee the protection from the abrasion caused by the passage of the TBM tail brushes.
Ref #: 0
Category:

Construction

Location Bedok Reservoir Road Singapore, Singapore
Subcategory
Built in 2011
Opened in 2014
Application Type
Client LTA
Contractor company CMC di Ravenna

Product used for the project

MAPEBLOX T
MAPEBLOX T
Tail sealant for mechanized tunneling with TBM
MAPEDRILL F1
MAPEDRILL F1
Synthetic polymer in liquid form for water based fluids to be employedin…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…