Downtown Line Stage 3 - Contract 927

Location icon Bedok Reservoir Road Singapore, Singapore
Contracts 926 and 927 are for the construction of Tampines West and Bedok Reservoir stations and their associated tunnels.
2 EPBM (Robbins) excavated the tunnels for a length 2x 2600 m.
In order to protect the concrete segment lining, the product MAPECOAT W SP was used in order to guarantee the protection from the abrasion caused by the passage of the TBM tail brushes.
Ref #: 0
Category:

Construction

Location Bedok Reservoir Road Singapore, Singapore
Subcategory
Built in 2011
Opened in 2014
Application Type
Client LTA
Contractor company CMC di Ravenna

Product used for the project

MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
MAPEDRILL F1
MAPEDRILL F1
Synthetic polymer in liquid form for water based fluids to be employedin…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…