Contract 930 included the construction of Ubi station and its associated tunnels. excavated with 3x EPBM (Herrenknecht) In order to protect the concrete segment lining, the product MAPECOAT W SP was used in order to guarantee the protection from the abrasion caused by the passage of the TBM tail brushes.