Downtown MRT Project Line- Contract NIPE 4 at Singapore

Location icon Singapore, Singapore
The Downtown Line (DTL) will be the fifth Mass Rapid Transit line in Singapore. The line will be about 42 km long with 34 stations and serve about half a million commuters daily.
For the final coating MAPECOAT W SP is the product used.
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2006
Opened in 2012
Application Type
Client PUB
Contractor company Penta Ocean
Exception occured while executing the controller. Check error logs for details.