Downtown MRT Project Line- Contract NIPE 4 at Singapore
Singapore, Singapore
Description
The Downtown Line (DTL) will be the fifth Mass Rapid Transit line in Singapore. The line will be about 42 km long with 34 stations and serve about half a million commuters daily.
For the final coating MAPECOAT W SP is the product used.
Construction
|
|
Location |
Singapore, Singapore
|
Built in |
2006
|
Opened in |
2012
|
Client |
PUB
|
Contractor company |
Penta Ocean
|
To navigate, press the arrow keys.
Exception occured while executing the controller. Check error logs for details.