Exit Portal of the hydraulic project TEO

Location icon Mexico City, Mexico
One EPB Herrenknecht with a diameter of 8.7m excavated the tunnel for a total length of 15000m.
Ref #: 0
Category:

Construction

Location Mexico City, Mexico
Subcategory
Built in 2010
Opened in 2015
Application Type
Client Mexico's National Water Commission Conagua
Contractor company Lombardo Construcciones, Estrella

Product used for the project

MAPEDRILL M1
MAPEDRILL M1
Synthetic polymer in liquid form for water based fluids to be employed in…
MAPEDRILL SA1
MAPEDRILL SA1
Super absorbent liquid polymer Where to use Mapedrill SA1 is especially…
POLYFOAMER FP/CC
POLYFOAMER FP/CC
High performance liquid foaming agent, based on biodegradable anionic…