Expolink 2020

Location icon Dubai, United Arab Emirates
Two twin tunnels, each measuring 19.5 km long, with an internal diameter of 8.8 m.
Ref #: 0
Category:

Construction

Location Dubai, United Arab Emirates
Subcategory METRO
Start and finish date 2017
Application Type
Contractor company Consortium Alstom, Acciona, Gulemark

Product used for the project

MAPEBENT CBS2
MAPEBENT CBS2
Bentonite for use in all engineering application
MAPEBLOX H
MAPEBLOX H
MAPEBLOX H
MAPEBLOX T S
MAPEBLOX T S
Tail sealant for mechanized tunneling with TBM Product sold only by Mapei…
MAPEDRILL M1
MAPEDRILL M1
Synthetic polymer in liquid form for water based fluids to be employed in…
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Liquid activator admixture used in extremely fluid backfill grouts systems,…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…