Extension of FGC Railway S2 line SABADELL

Location icon Sabadell, Spagna, Spain
3,6 km twin tunnels, excavated by a 6,8m diameter TBM-EPB Herrenknecth
The tunnel is excavated with a TBM-EPB manufactured by Herrenknecht. Soil includes cohesive material (clay in particular) and sand in varying percentages and are conditioned with the Polyfoamer FP.
12 cross passages between the two main tunnels: Shotcrete - Excavation by mecanic means Waterproofing
Ref #: 0
Category:

Construction

Location Sabadell, Spagna, Spain
Subcategory
Built in 2011
Opened in 2014
Application Type
Client GISA
Contractor company UTE TUNEL SABADELL (ACCIONA-COMSA-ACSA)