Follo line

Location icon Oslo, Norway
The Follo Line is a 22.5-kilometer high-speed railway between Oslo Central Station and Ski Station. Most of the line, 19 kilometres is in a single tunnel, which will be the longest railway tunnel in the country. Mapei UTT supplied admixtures for backfill grouting: MAPEQUICK CBS SYSTEM 3 HEM SS, MAPEQUICK CBS SYSTEM 1 EVO.
Ref #: 0
Category:

Construction

Location Oslo, Norway
Subcategory
Built in 2016
Application Type
Contractor company Ghella-Acciona

Product used for the project

ADESILEX PG4
ADESILEX PG4
Two-component, thixotropic, epoxy adhesive with modified-rheology for bonding…
MAPEGROUT COMPACT
MAPEGROUT COMPACT
Pre-mixed injecting grout characterized by great resistance to wash-out and…
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…
2225 - MAPEQUICK CBS SYSTEM
MAPEQUICK CBS SYSTEM
Product not available for this market,
contact us